We support you through the development application process by producing all required civil engineering documentation.
Learn moreDesign drawings and models for operational works to ensure construction can happen as quickly as possible.
Learn moreWe manage projects through the construction phase by conducting inspections and providing contract admin services.
Learn moreA boutique Brisbane-based civil engineering firm, Context Engineering comprises a team of innovative, driven and proactive engineers who focus primarily on infill, commercial and urban development. We have experience in the residential, commercial and industrial sectors throughout Queensland and Northern NSW.
With a broadminded and innovative approach to design, we apply common sense, best practice and originality to each and every project we take on.
ARC Residences is a multiple storey residential high rise adjacent to the Brisbane River in Toowong. Prepared civil design and documentation for the site including Development application report and drawings. Civil design works included earthworks for basement excavation, flood risk mitigation, water and sewer connection.
- Spyre Group
Creation of a Bunnings warehouse including internal access pavement and carparking areas. Prepared detailed design documentation including bulk earthworks, roadworks details and stormwater infrastructure plans. Managing construction phase activities including inspections and liaising with other consultants.
- H.Troon
We provided civil site design and construction services as part of our involvement in this project.
- ACB Project Solutions
Montague Markets is multi-use development consisting of retail and residential high-rise. Provided detailed design, tender assessment and construction supervision for the delivery of trunk sewer infrastructure.
- Pradella
Multi-storey boutique apartment building in Burleigh Heads. Delivered necessary documentation for Development Approval including civil design drawings for basement excavation, sewer and stormwater connection.
- Spyre Group
Designed and managed several sites within the Redlands Business Park. This includes providing documentation for Development Approval, Detailed Design and Construction Phase activities. Civil design and construction works included earthworks, pavement details and stormwater layout.
- Howell Constructions
New commercial development located in the Big Fish commercial area being development near Caboolture. Context Engineering provided the civil engineering for the detailed design phase of this project including earthworks, internal roadworks and pavement design and stormwater drainage. Construction supervision was also undertaken.
- Eildon Funds & H. Troon
Retrofitted new stormwater infrastructure as part of proposed redevelopment works of the existing podium level of Peninsula Apartments. Managed construction activities and project close out.
- SMC Building & Construction
Development involved the creation of multiple townhouses in Calamvale. Provided detailed design documentation for earthworks, roadworks, stormwater, sewer and water connection. Liaised with local and government authorities during operational works approval process.
- Heran Building Group
Design support for the Clarendon Dam and Bill Gunn Dam safety upgrade project. Included the repair and remediation of existing damage and defects to the pavements along the top of the embankment structures.
- Christopher Contracting
Bunnings warehouse and carparking in Narre Warren. Context provided the Stormwater Management Plan and schematic stormwater design drawings for Development Approval. Progressed project through detailed design through provision of earthworks, stormwater, pavement, water and sewer connection plans.
- H. Troon
The Underwood Service Station is a Commercial development including multiple drive through food and drink outlets with an internal driveway and carparking area. Provided civil design and documentation for the site including a Dilapidation Report, earthworks, pavement, vehicle crossover, stormwater, water and sewer plans.
- ACB Projects
Water connection for Springfield Central Station Park ‘n’ Ride. Provided detailed review of Major Works design plans for constructibility against the SEQ Code, and supervised compliance and construction phase activities including live connection works and project close out.
- GUNNE Civil Constructions